Application and selection overview
Automation components for factory control, machine building and production line upgrades. We help identify suitable PLCs, HMIs, sensors, relays, contactors and control components by brand, model and application.
Key parameters to confirm
| Item | Information to provide |
|---|---|
| Control platform | PLC, PAC, remote I/O or industrial PC brand, family, CPU, memory and redundancy. |
| Field signals | Digital and analog types, voltage, current, thermocouple, RTD, encoder and high-speed counting. |
| Operator interface | HMI size, ports, software version, languages, recipes and historian requirements. |
| Networks and integration | PROFINET, EtherNet/IP, Modbus, OPC UA or serial, plus switches and gateways. |
| Safety and environment | Safety level, emergency stop, isolation, enclosure, hazardous area, temperature, vibration and EMC. |
RFQ checklist
- Send the architecture, BOM, I/O list and photographs of installed models.
- Mark each item as addition, identical replacement, compatible alternative or obsolescence upgrade.
- Provide firmware, engineering-software, program backup and network-configuration versions.
- State quantities, spare ratio, destination and planned shutdown date.
Common mistakes and risks
- Ordering by family and missing power supplies, terminals, bases, connectors or licenses.
- Hardware or firmware differences making software and network configuration incompatible.
- Treating component supply as system safety validation and omitting risk assessment or site testing.
Frequently asked questions
Can an existing BOM be quoted as one package?
Yes. Mark items that must remain identical and those open to alternatives, and include revisions so obsolete products can be identified.
Is cross-brand replacement practical?
It may be functionally possible but normally changes wiring, size, communications, software, approvals and commissioning; it is not a drop-in replacement.
Is programming included?
This page covers product selection and supply enquiries. Programming, commissioning and safety validation require separately agreed project scope.
Next step
Upload the BOM or list each brand, complete model, quantity, purpose, revision and required date. We will first identify missing information and the supply scope that can be confirmed.
